top of page

Expert Remodeling Advice for Florida Homes, Commercial Spaces & Disaster Recovery


HVHZ Construction: What Miami-Dade and Broward's Stricter Wind Codes Mean for Commercial Buildouts
Most of Florida builds to one wind standard. Miami-Dade and Broward counties build to another. The High Velocity Hurricane Zone (HVHZ), defined in Chapter 1620 of the Florida Building Code, was created in the aftermath of Hurricane Andrew, after the 1992 storm exposed just how badly standard construction and inconsistent product testing had failed the region.
Sep 283 min read


What It Takes to Be an Approved Contractor on a Florida School Campus
Building or renovating a Florida public school isn't like taking on a typical commercial job. Before a contractor ever picks up a tool, there's a public procurement process to win the work, a design standard beyond the Florida Building Code to build to, and a state-mandated background screening process just to get crews through the front gate.
Sep 223 min read


Inside Maloney Construction's LeeTran Beach Park & Ride Canopy Rehab in Fort Myers
Not every commercial project happens behind a fence with the doors closed. Some of the most demanding rehab work happens in public, on a facility that can't simply shut down while the work gets done. That's the case at LeeTran's Beach Park & Ride in Fort Myers, where Maloney Construction is leading a full rehabilitation of the transit canopy that shelters riders, trolleys, and buses moving through one of Lee County's busiest park-and-ride hubs.
Sep 143 min read


Building Out a Fitness Studio or Gym: What Florida Commercial Contractors Need to Know
Florida's fitness industry isn't slowing down. Boutique studios, national franchises, and multi-location gym operators are opening new locations across the state faster than almost any other commercial category, and property managers and landlords are increasingly counting on fitness tenants to anchor retail centers and mixed-use developments.
Sep 74 min read


Commercial Renovation in Sarasota: Permitting, Timelines, and What to Expect
Sarasota has one of the densest concentrations of retail, hospitality, and medical office space on Florida's Gulf Coast — from the storefronts downtown and along University Parkway to the resorts on Siesta Key, Lido Key, and Longboat Key, to the medical office corridor built up around Sarasota Memorial Hospital. That density is good for business, but it also means Sarasota's permitting process carries layers that owners renovating in less built-out markets don't always plan f
Aug 254 min read


Florida Condo & HOA Structural Integrity Reserve Study (SIRS) Deadlines: What Boards Need to Know
Since the Champlain Towers South collapse in 2021, Florida has rewritten the rules for how condo and co-op buildings are inspected, funded, and maintained. What started as SB 4-D in 2022 has since been amended, most recently through HB 913, and the result is a set of deadlines that Florida condo and HOA boards can no longer treat as optional or distant.
Aug 183 min read


Restaurant Renovations: Balancing Health Code, Kitchen Equipment, and Dining Room Design
Most commercial renovations answer to one set of priorities: budget, timeline, and design intent. Restaurant renovations answer to two — and they don't always agree.
Aug 113 min read


Mold Growth After Water Damage: What Florida Property Owners Need to Know
Florida's heat and humidity don't leave much margin for error after a pipe bursts, a roof leaks, or a storm sends water into a building. Mold doesn't wait for an insurance adjuster or a contractor's schedule to open up. It starts working within hours, and by the time it's visible, the scope and cost of the repair have usually already changed.
Aug 43 min read


Why National Retailers and Multi-Location Operators Trust Regional Contractors for Deferred Maintenance Programs
If you manage facilities across multiple locations — whether retail stores, fitness studios, hotels, or commercial properties — you already know that deferred maintenance doesn't disappear. It accumulates. And when it finally comes due, the scope, cost, and disruption can be significant if the wrong contractor is executing the work.
Jul 283 min read
bottom of page



.png)